Autoclaved Aerated Concrete (AAC)

AAC Material Handling And Installation Guidelines

VERSION
June 2004

Table of Contents

 

Walls - Horizontal Wall Panels
1 - Material Handling Procedures
2 - Tools Required
3 - Installation Guidelines - Steps 1 - 11
4 - Points To Check - Points 1-5

Floor and Roof - Precast Panels
1 - Material Handling Procedures
2- Tools Required
3 - Installing Panels - Steps 1-6
4 - Filling Joints - Steps 1-3
5 - Panel Penetration Guidelines
6 - Points To Check - Points 1-4


Walls - Vertical Wall Panels
1 - Material Handling Procedures
….Tools Required For:
2 - Installation of Wall Panels
3 - Unloading & Handling Of Panels - Steps 1-2
4 - Preparing To Erect First Panel - Steps 3-6
5 - Preparation For Setting 1st Panel - Steps 7-10
6 - Attaching Panels - Steps 11-13
7 - Securing Panels - Step 14-17
8 - Leveling And Attaching Floor Panels - Step 18

Routing Channels - Walls & Floors
1 - Tools Required
2 - Routing Guidelines - AAC Block Walls
3 - Routing Guidelines - AAC Precast Floor
4 - Points To Check


Precast Masonry Products
1 - Material Handling Procedures
2 - Tools Required
3 - Leveling Course: Steps 1 - 7
5 - Typical Coursing: Steps 1 - 7
7 - Typical Coursing: Lintels
8 - Typical Coursing: Wall Junctions
9 - Typical Coursing: Movement Joints


10 -Typical Coursing: Anchoring AAC
11 - Window Sills/Lintels
12 - Anchoring Steel And Wooden Doors
13 - Tie Downs And Reinforcing AAC
14 - Floor Attachment
15 - Points To Check

General Information -
AAC Related Products
1 - List Of Products And Contacts

 


Return to AACPA homepage

End T.O.C.

© 2000 AAC Products Association - All Rights Reserved