|

|
Autoclaved Aerated Concrete (AAC)
|
|
AAC Material Handling And
Installation Guidelines
|
VERSION
June 2004
|
|
Table of Contents
|
|
|
Walls - Horizontal Wall Panels
1 - Material Handling Procedures
2 - Tools Required
3 - Installation Guidelines - Steps
1 - 11
4 - Points To Check - Points 1-5
|
Floor and Roof - Precast Panels
1 - Material Handling Procedures
2- Tools Required
3 - Installing Panels - Steps 1-6
4 - Filling Joints - Steps 1-3
5 - Panel Penetration Guidelines
6 - Points To Check - Points 1-4
|
|
|
|
Walls - Vertical Wall Panels
1 - Material Handling Procedures
….Tools Required For:
2 - Installation of Wall Panels
3 - Unloading & Handling Of
Panels - Steps 1-2
4 - Preparing To Erect First Panel -
Steps 3-6
5 - Preparation For Setting 1st
Panel - Steps 7-10
6 - Attaching Panels - Steps 11-13
7 - Securing Panels - Step 14-17
8 - Leveling And Attaching Floor
Panels - Step 18
|
Routing Channels - Walls & Floors
1 - Tools Required
2 - Routing Guidelines - AAC Block
Walls
3 - Routing Guidelines - AAC Precast Floor
4 - Points To Check
|
|
|
|
Precast Masonry Products
1 - Material Handling Procedures
2 - Tools Required
3 - Leveling Course: Steps 1 - 7
5 - Typical Coursing: Steps 1 - 7
7 - Typical Coursing: Lintels
8 - Typical Coursing: Wall Junctions
9 - Typical Coursing: Movement
Joints
|
10 -Typical Coursing: Anchoring AAC
11 - Window Sills/Lintels
12 - Anchoring Steel And Wooden Doors
13 - Tie Downs And Reinforcing AAC
14 - Floor Attachment
15 - Points To Check
|
|
General Information -
AAC Related
Products
1 - List Of Products And Contacts
|
|
|
|
|
Return to
AACPA homepage
|
End T.O.C.
|
|
|
|
|
|
|