AAC Horizontal Wall Panels
Points To Check


Point 1
Supporting columns must be plumb, level and within linear building line tolerances.

Point 2
Protect the panels from rain water saturation by leaving them on pallets and away from standing water.

Point 3
Set panels with tongue side up and follow specifications and shop drawings for placement of adhesive and joint filler.

Point 4
Panel(s) must lay flush against face of column or steel shim plates.

Point 5
In the event bowing occurs with the AAC panels within a column bay,


stack the AAC panels so that the bow is constant in one direction.

Failure To Adhere To
These Proper Installation
Procedures Will Render
Warranty Null And Void