AAC Horizontal Wall Panels
Laying Panels


Step 1 - Check layout -
Check panel layout of approved AAC shop drawings
and deliver panels to job site accordingly.

Step 2 - Unload bundles -
Unload the bundles in a proper manner using approved unloading gear. Eliminate excessive handling by storing panel nearest to where they will be installed. Protect the panels from rain and water saturation by leaving them on pallets and away from standing water.