AAC Precast Floor Panels
Installing Panels


Step 5 -
Repeat For Remaining Panels.

Lay the remaining panels ensuring that each one
is seated firmly beside the preceding one.

 


Step 6 -
Placing Last Panel.

The correct lifting gear will greatly assist placement of the last panel. Special procedures may be required if other lifting devices are used (i.e. slings or ropes).